In order to provide an accurate quote, ACC needs the following information:
1. An accurate Bill of Materials (BOM) complete with manufacturers' names and part numbers. (Required)
2. Complete Gerber data files preferred. Extensive drawings with dimensions, layer count, drill count and size, etc. is acceptable for quotation purposes only. For production, CAD data or, at least, complete Gerber data and placement data is required. Placement data must be centroid in nature (geometric center of each component including all leads).
3. Expected Annual Usage (EAU) with a Release Schedule. Example: EAU = 12,000 with Monthly Releases of 1,000 units. (Required)
4. Pictures and/or Samples of each assembly. If a picture is worth a thousand words, we believe that a sample is worth at least a hundred pictures. (If possible - Extremely helpful)